Ready to release
A score of at least 75 and no open gate, with suite results behind it.
The Quality Command Center reads your suite runs and scans, and the project's requirements and UAT cycles, into one score out of 100 and a recommendation. When it says hold, it names what is holding the release, so your QA team has the evidence and your release owner makes the call.
Four pillars, weighted. A pillar with nothing measured is left out and the others are re-weighted, so read the score beside the Discipline health cards, which show what wasn't measured.
The pass rate of every test result from your automated suite runs, over all time. Skipped results, suite sensitivity runs and infrastructure aborts are left out.
Weighted by business risk: a critical requirement counts eight times a low-risk one. A requirement counts once it has a test that can run, whether or not that test has run yet.
The share of tracked tests that are not flaky. A test needs enough runs to be judged at all.
The average of your performance, security, accessibility and visual results, each read by its weakest target, and your UAT pass rate, from the last 30 days, for those that have results.
It reads your own suites and scans, filed under the project or under none, and the project's requirements and UAT cycles, so two people on one project can see different scores.
A score of at least 75 and no open gate, with suite results behind it.
A lower score, a warning, or scan and UAT results with no suite run. Each warning costs 7 points.
Any blocking gate, whatever the score. It also caps the score at 40.
No suite run, scan or UAT result to score, so there is no number. Requirements or linked tests alone don't change that.
A blocking gate holds the release even with no score. The 75 is a default your test lead can change.
Eighteen rules, set per project, or for your own work outside any project. Each one blocks the release, warns or is off. These are QAEverest's defaults until someone changes them.
Scan, visual and UAT rules read the last 30 days: older results stop counting, and so do their gates. A requirement's risk comes from its linked tests or, with none rated, its refined story's priority. A Jira or generated requirement with no rated test counts as medium risk.
Use QAEverest defaults puts every rule and number back, ready to save.
If our server hits an error, the gate answers passed: true with the reason “Gate unavailable”, and a check that can't be read drops out of the answer. If the server can't be reached, your pipeline step decides what happens.
On Insights → Quality Center, the Readiness report button opens a short panel, and Download PDF saves the report. It opens with what the person making the call needs. The rest is the evidence your QA team stands behind.
Ready to release, Release with caution, Hold release or Not enough evidence, with an executive summary in plain sentences.
Requirement evidence over the last 30 days, for information unless an evidence gate is on, followed by:
For QA leads and auditors: the rules behind the recommendation, who set the gates, and the windows and limits the numbers were read under.
Download the list as a PDF, or email it. Recipients outside your organisation get a masked copy unless your admin has approved them. With no organisation, you choose which copy they get.
Your QA lead plans the cycle, the people who know the business run it, and each approval counts only for the results it was given against.
A QA lead creates the cycle, with its environment and dates if needed, and copies in cases from their own suites, Test Sets or generated test cases, or writes them by hand. AI can also write UAT scenarios from a story's acceptance criteria, charged per scenario.
The owner assigns cases to people in the project, one person per case. Every case starts as a must-have, and the owner switches off the ones that aren't. The ready-made tester role holds three permissions: view projects, view execution reports and run assigned UAT cases.
Testers work through My UAT Tasks one case at a time, recording pass, fail, blocked or skipped. A fail or a block has to say what they saw.
The owner or the assigned tester can rate a failed or blocked case, and file it to a connected Jira or ClickUp from the cycle's Defects list.
Approvers review the results, then approve, approve with conditions or reject, and type their full name. Conditions have to be listed, and a rejection has to say what must change. The exit criteria inform the decision and don't stop a sign-off.
Record a result, add or remove a case, or change a case's assignee or must-have flag, and the results version moves on. Earlier sign-offs read as out of date. While the cycle is in progress, that holds the release by default until they are given again. If the owner closes the cycle instead, it becomes a Closed without sign-off warning.
The cycle owner and signed-in approvers can download it as a PDF once any listed approver has answered. Its banner says where sign-off stands, and it lists each approver's decision, the name they signed as, when, the results version and whether that sign-off still stands. The cycle report downloads as PDF or Excel.
The report says what it read and over which window, and the PDF leaves a line for your release owner to write the decision.
Linked tests with nothing run give no number, so coverage alone never reads as ready.
Blocking gates are listed in words a release owner can read.
SIT, UAT, performance, security or accessibility with nothing to read are named as not assessed in the executive summary.
A new result moves the version, and earlier sign-offs stop counting until they are given again.
In the report's summary, only failures your team rated count as Critical / High, and estimates are shown beside them.
Recent changes lists the latest 10 saves of the gates, with who made them and when. Each sign-off keeps the counts it was given against.
Run your suites, open Insights → Quality Center, and download the Readiness report before your next release.